Bell Road/Grand Avenue ramps to be closed Sept. 18-24 for improvements Crews to remove a median island, add curbing in overpass area

SURPRISE – The on- and off-ramps at the Bell Road Bridge over Grand Avenue (US 60) will be closed Sept. 18-24 for roadway improvements both on and near the overpass.

The Bell/Grand ramps will be closed from 1 a.m. Monday (Sept. 18) to 5 p.m. Sunday (Sept. 24), according to the Arizona Department of Transportation. Drivers can use detour routes along Dysart and Litchfield roads to make connections between Bell Road and Grand Avenue. Bell Road will remain open for traffic traveling over the bridge.

During the week, crews will be removing the median island along westbound Grand Avenue near the Bell Grande Drive intersection. The change is designed to provide improved guidance for drivers making left turns onto Bell Grande Drive while clearly separating that traffic from vehicles using the westbound off-ramp at the Bell Road overpass. Drivers should use caution in the work zone and expect restrictions along westbound US 60 and left-turn closures at the Bell Grande Drive intersection.

Crews also will add sections of what are known as mountable, rounded curbs near the ends of the existing barrier walls separating the on- and off-ramps near the crosswalks on the Bell Road overpass. As an additional safety measure, yellow flexible safety posts will be placed near the ends of the ramp barrier walls. The changes are designed to help drivers with turning angles between Bell Road and the ramps.

The ramps first opened to traffic in February as part of ADOT’s $42 million project to build a new interchange connecting Bell Road and Grand Avenue. The improvements are the result of feedback from local drivers as well as staff at ADOT and the city of Surprise.

Comments

Popular posts from this blog

City Page Survey

Fall Book Discussion and Movie Series

Book discussion group to meet