KDAZ-DB Desert Radio AZ Podcasts

On The Road With ADOT

Improvement project on SR 95 at Bullhead City Parkway and Laughlin Bridge intersection will begin next wee

Motorists should expect delays during the night work

Construction to build a raised median between the Bullhead Parkway and Aviation Way intersections as well as repave Aviation Way to the Laughlin Bridge intersection in Bullhead City on State Route 95 will begin Monday (Oct. 26).

Work will take place nightly from 6 p.m. Sunday to 5 a.m. Friday. While one travel lane will remain open in each direction, motorists should be prepared for up to 15 minute delays.

The first phase of work will include setting up traffic control barrier and removing the existing asphalt.

The speed limit will be reduced and drivers should be alert for construction workers and equipment.

The $1.5 million improvement project is expected to be completed in May 2016.

ADOT works to inform the public about planned highway restrictions, but there is a possibility that unscheduled closures or restrictions may occur. Weather can also affect a project schedule.

For more information about this project, please call Michele E. Beggs at 928.681.6054mbeggs@azdot.gov.

Information about all ADOT projects: email ADOT projects@azdot.gov or call the ADOT information line at 1.855.712.8530.


Comments